Do you hear a rattling sound from the engine? Is oil consumption increasing? Or suddenly smoke appears and torque starts to weaken?
The question that is always repeated to us: Should I change the engine or overhaul it?
In many Changan CS85 cases, the problem starts with oil consumption or weak pistons due to high heat or delayed oil changes, and over time the fault develops and affects the entire engine.
Inside the workshop, we inspect the entire engine before any decision:
* Engine compression test
* Turbo test
* Oil consumption test
* Pre and post-repair inspection
If it needs replacement, we provide refurbished engines in the workshop with original parts and matching specifications, not unknown used engines from scrapyards.
Warranty: 3 years or 30,000 kilometers, whichever comes first
Includes dismantling, installation, oils, and filters
Completion time: 2 to 3 days
And most importantly:
A radical and guaranteed solution, and if the problem is not solved, the customer is not obligated to pay. Our goal is to fix the defect before anything else.
#Changan #CS85 #Changan #Changan_CS85 #Changan_Engines #Changan_Repair
Changan 95
Changan 75 Plus and Standard
High Warranty
Hunter
Al-S7
MG 5
MG 8